London
-

Proposed London datacentre ‘incompatible’ with net zero with 1m-tonne carbon footprint
Planning documents for the proposed £14.7bn East Havering Data Centre Campus in outer London reveal that the site would generate 1.2 million tonnes of carbon dioxide. In short, equivalent annually…